Office building "Le Prélude" 
The property developer HINES entrusted the Project Management to AURIS. The role consists in the coordination of design team (architect and consultant engineers...   Open realisation 
Office Building "L'Angle" 
The mission of the Project Manager in this case applies to the direction and coordination of the design development phase and to overall management during the c...   Open realisation 
Tribunal de Commerce et Conseil de Prud’homme de Bobigny 
The role of client side technical and cost assistance consists in the critical analyse of the documentation produced by the architect and formulating where nece...   Open realisation 
Appartment Building "Les Ateliers du XXème" 
AURIS has been entrusted with 3 principal roles : Establishment of the Tender and Contract package, Construction Management and coordination of post contract v...   Open realisation 
Office Buildings "Les Arcas" 
The mission of Project Management commenced during the design development phase. It consisted in assuring : - engineering management : establishment of speci...   Open realisation 
Dependant Aged Persons Home « Les Tilleuls »  
Le Conseil Général des Yvelines (78) called tenders for innovative projects concerning the dependant aged persons homes of the area. Within this context, the re...   Open realisation 
Lycée Professionnel « Théodore Monod » et I.U.F.M. « Léon Jouhaux »  
In response, AURIS undertook a programmatic study, consisting of 2 phases : 1) Pre-Programme which sought to indicate to the client the spacial and organisa...   Open realisation 
Boarding School Eugène Napoléon 
The construction Management of the project particularly concerned sur : The organisation and time scheduling of the site Cost effective organisation and con...   Open realisation 
Office Building - le Carat 2 
Client side technical assistance ensures that the future property owner makes informed decisions during the construction of the acquired project. The organisati...   Open realisation 
Lycée Professionnel Saint François d'Assise 
Our role as client advisor / client representative for the project consisted of : An audit of the existing buildings Feasibility study : elaborated in terms o...   Open realisation 
Retail Centre « Grand Ciel » 
- Putting in place the project team and assist Corio with the decisional process undertaken with the co-property owners. - Direct and coordinate the project t...   Open realisation 
Educational Facility Dupanloup 
The client representative / assistant’s role involves underlining the technical, financial and administrative incidence of proposed architectural solutions to ...   Open realisation 
Ecole Nationale d’Administration 
La mission of Client Representative involved the direction of the project from the feasibility phase to the handover : - Assisting the client in the elaborati...   Open realisation 
Educational Facility Notre-Dame 
- Conclude property transactions with the local authorities responsible for the “ZAC”. - Ensure the integration of the 1 470 m² school extension within a proje...   Open realisation 
Lower School « zéro énergie » 
AURIS, as mandated client assumes the following tasks : - Analysis of project brief and provisional budget - Confirmation of the time schedule - Assistance i...   Open realisation 
Free way service stations 
SANEF sought to develop an original concept of a « retail village » capable of being applied to the totality of their freeway network. The retail villages would...   Open realisation 
Office Building "Meunier IE" 
The missions entrusted to AURIS cover: 1) Project Management 2) Construction Management 3) Upfront engineering coordination and synthesis...   Open realisation 
Saint –Gobain International Research Campus 
Auris was chosen to provide complete client representative services, from the the brief development and sketch design phase to the construction and handover pha...   Open realisation 
Medical-Social Institute and Specialised Education and Home Care Service  
The client assistance mission was broken down as follows: - Preliminary design: prospecting for financing, town planning and land availability feasibility, le...   Open realisation 
“Digiteo Labs” research centre, Palaiseau (91) 
The mandated site management mission was broken down as follows: - Supervision of project manager’s studies: analysis of preliminary design and project stud...   Open realisation 
“Le Khapa” office building, Boulogne (92) 
The mission given to the Technical Project Manager concerned the management and coordination of the design studies as from the works phase and included all the ...   Open realisation 
Office building in Montigny-le-Bretonneux (78) 
The mission given to AURIS concerned the management and coordination of design studies as from the detailed design phase and works supervision through to the co...   Open realisation 
“Axe Seine” office building, Nanterre (92) 
The mission given to the Technical Project Manager concerned the management and coordination of design studies as from the detailed design phase and all buildin...   Open realisation 
“Les Hautes Terres” housing block, Noisy-le-Grand (93) 
The mission given to AURIS began during the building permit phase Our main missions: preparation of the contractor tender files, works supervision. ...   Open realisation 
“Le Clos du Village” housing block, Créteil (94) 
Auris was chosen to carry out a Technical Client Assistance mission from the negotiation phase through to the delivery phase, as well as assist the client in it...   Open realisation 
“L’Opale” office buildings - ZAC Walwein, Montreuil (93) 
AURIS was chosen to carry out a complete client assistance mission from the detailed design phase through to the construction phase and the handover of the work...   Open realisation 
“Anthos” office building - ZAC Seguin, Boulogne (92) 
The mission given to the Technical Project Manager concerned the supervision of building works, in coordination with the operation’s architect and the various e...   Open realisation 
Marne-La-Vallée University Library (77)  
- Control over all operational expenses and organisation of the approved and pending phases, - Organisation of intervening parties (preparation of the project...   Open realisation 
Shops in Orgeval (78)  
Our mission incorporated the following aspects: - Design management: . Preparation of the contract specifications . Engineering - Surveying - General wor...   Open realisation 
Interministerial restaurant, Paris, 7th arrondissement 
Our client representative mission is broken down as follows: - Analysis of the programme and budget estimate, ascertaining technical and functional feasibil...   Open realisation 
“BAYER – A” high rise office building in Puteaux (92) 
The mission given to AURIS concerns the management and coordination of the design studies as from sketch design phase, followed by works management through to c...   Open realisation 



 